Over last few days the outside deck has had upgrading with rails etc – now
even flower pots – I suggest they may have exceeded their rental contract –
the foot print is what they paid for but upper deck larger than base – See
2005 on Patios and 8 foot rule for
sidewalks – until quite recently ‘street
signs’ were illegal – and here from 2004
where signs take over sidewalks – now its patios |
Sidewalks as
public property |
|
First
it was all the signs and advertising – now a local hotel has ‘rented’
sidewalk to build a street patio --- next thing they will call it
‘revitalization’ and have us pay for it too
|
|
I
will return to this tomorrow questioning if carrot is a giveaway or
sustainable --- Here note how PR Economic
Development will soon do a press release on their hiring replacement for last
Manager |
City Council
--- carrots an sticks on revitalization |
|
|
|
|
Work Safe BC
looks at Epicurean building |
|
It came out at
Council meeting that Work Safe has yet to come up with a plan how the
building can be safely removed and should have one by end of week – I am told
there was a downstairs suite – which would make using backhoes etc
dangerous--- presently sidewalk covered with glass etc |
|
It
ain’t going to be easy – the reason Hays Creek chosen originally was that it
is ‘easy’ access’ to the ocean – above I was told the fellows were checking
out the current sewer lines --- presumably ‘communicating’ with the fellows
at yellow arrow (below) to see how sound that sewer line ----- I was told
will take a pumping station (Yellow arrow above??) and then pumped up 9th
Avenue where can be gravity fed to Petrocan area etc – more later – I am told
routes not chosen yet --- I suggest that may be a good time to look at longer
view – like when if treatment will take place etc |
Replacing
the Hays Creek Sewer line --- it runs along the stream bed --- and DFO wants
it removed – the whole project is on order of 5M$ -- more later |
|
|

|
|
Local Kids
‘artwork’ removed |
|
Last night the crayons covered the sidewalk – today much of it removed --- it has been suggested that these plywood panels might make a good easel for the kids art work in a more controlled exhibit of their skills
|
|
|
Signs of the
season |
|
The
salmonberry bush was unusually productive --- the fellow picking said down
along the seashore he had also found good berries --- had 3 gallons worth of
buckets so it will be along day for him |
|
|
Kids liked the fountain
|
|
Might
have been drained by Thursday PM – we’ll see if kids get their pool back again
--- |
Created by LG on 8/7/2010